We started the week laying out the footers for the landing, yep, more mixing and pouring cement for Stu.
All the wood for the upstairs ceiling arrived. Yes, we will be staining ALL of those...😬
All the footers done.
The door upstairs is installed, we just need to paint it.
Mom and Bambi stopped by for a snack.
We got all the poles for the landing up.
We put two steps to the front door on the deck to lower the height of the deck a little.
They look great!
Our roofers started, it looks really good! Can't wait to see it with the siding.
Stu and Kenny trying to figure out the measurements for the landing. Because we are using old telephone poles and they are all different diameters, it was a little challenging.
Stu and I cut all the steps up to the deck.
The power panel is in place.
Our interior doors arrived, we'll be staining those soon too.
The landing and steps up in place.
They started on the railing today, we are using what they call around here "hogwire".
This is where we left it today. We'll be working on the handrails and finishing the roof next week.
We had a good week, looking forward to more progress next week!



















No comments:
Post a Comment