Saturday, July 31, 2021

Woo Hoo! Forward Progress!

 We started the week laying out the footers for the landing, yep, more mixing and pouring cement for Stu.


All the wood for the upstairs ceiling arrived. Yes, we will be staining ALL of those...😬


All the footers done.


The door upstairs is installed, we just need to paint it. 


Mom and Bambi stopped by for a snack.


We got all the poles for the landing up.


We put two steps to the front door on the deck to lower the height of the deck a little.


They look great!



Our roofers started, it looks really good! Can't wait to see it with the siding.


Stu and Kenny trying to figure out the measurements for the landing.  Because we are using old telephone poles and they are all different diameters, it was a little challenging.



Stu and I cut all the steps up to the deck.


The power panel is in place.


Our interior doors arrived, we'll be staining those soon too. 


The landing and steps up in place.


They started on the railing today, we are using what they call around here "hogwire".



This is where we left it today.  We'll be working on the handrails and finishing the roof next week.


We had a good week, looking forward to more progress next week!

Monday, July 26, 2021

Deck Time!

It's been a while since the last post...we haven't been moving as quickly as we would like, but progress is progress.

We have started refinishing the cabinets we bought months ago. They'll need lots of work, more about those later.


We started work on the footers for the deck.  Stu made the form and mixed and poured the concrete.




One down, three to go!


Hard to see, but a coyote came walking through...😬


After the footers were poured, it was sonic tube time!  Yep, more mixing and pouring concrete.  In all, Stu mixed 36 bags of concrete, he's hard to keep up with!




This is our siding color in the back, the strip on the left is our trim/soffit color and the strip on the right will be the exterior doors for the garage and the shingles on the far right.


The walls for the gym and mechanical room are up. The heat and air is ready to go, the rough electric is done and the plumbing is full of water waiting for the building inspector. 


Back to the cabinets... Ugh!  So dirty!  They will clean up nicely though, but ugh!!


The doors and frames all cleaned up ready for paint.


Some of the cabinets before, you'll have to wait for the after shots, just like me...😆 We've started painting them, and they look great but all the pictures I've taken the color looks crazy, so we wait.


Morning shot on our way back out to the property. Hazy, hot and humid!


Time to put the telephone pole up as supports for the deck.  Stu and his tractor at it again!



First pole going up.


Kenny cutting slots for the facial boards.


Smoking some ribs for the crew.


Poles and frame are up!


Decking going down. 



And the last boards going on.


This is the current view from the deck, close to the building...no handrails!


Stu's a happy guy!




Public Announcement: Do not burn when it's 90+ degrees...


So, here we go with another week.  And again, we have high hopes.  We are hoping to get the stairs on the deck, the roof shingled and with any luck some of the siding on.  

Friday, July 9, 2021

Soffit Work

We had a good day today! Finally got Stu's creations up!
This is the first one going up.


On the right side is a sample of the siding color.


This is how they started out, salvaged from an old barn.




Hard to see but, the upper and lower soffits are painted and the battens are up.




We are actually home for the weekend getting caught up here, but will be back at it Monday!

June Update

Wow, it's been a really, really long time since I've updated! So, here we go... We've got the primer and self leveler on the gym...