We've had some very productive days, things are finally falling into place.
The septic system is in and we passed the electrical inspection today!
Time to get this well working! Stu drilling the hole for the pipe.
How many people does it take to get 120 feet of pipe with the pump down the well?
Well, for us it was 6...
Taa Daa!! We have water! We are having it tested tomorrow, but it's clear and has no sulfur smell.
The concrete guys showed up this morning, a day early, to pour the front porch.
The toilet has been installed in the apartment! It's the little things, lol!
We have to use a pump system for our septic system.
Our water is on it's way out, but still beautiful!
View of the house from the water side.
The front porch all done. About 5 days before we can walk on it, the forms will come off Friday.
The roofer is coming tomorrow morning.
Getting closer everyday...