Monday morning, no Kenny today but Robbie and Don our excavators are in doing their thing...
This is the front of the garage.
Today they worked on the area off the front porch.
Super steep right now but, the 8 additional concrete blocks arrive today.
View of the garage from the house. Yep, it's a hike...
Karen stopped by to check things out.
Robbie in the skid steer and Don directing.
Stu helping Robbie load and bring the blocks down.
Don working on getting us an easier path down to the dock.
This will be the patio in front of the house.
The footers for the Garage Mahal deck are dug.
Working on leveling off the lawn going to the water.
Looking back from the retaining wall.
Yesterday morning, finishing up the roof!
Our job was to cut the Zip board to length and hand it up to Kenny and Chad.
Robbie bringing the first of 4 long telephone poles down. They, along with several shorter ones we already had will be the supports for the garage deck.
Roof done and OSB siding almost done.
Bringing out a small load of OSB (at great cost! We've heard the price of lumber is falling, we have yet to see it. Last month OSB was $24 today it was $50...) to finish the outside walls and windows this morning. We should be in the dry by the end of the day, save for the doors/garage doors and 3 windows. Can't wait to see it!